Monthly Fire Facility Inspection Implementation Plan
About 723 wordsAbout 2 min
I. Case Introduction
Scenario Description
A corporate safety management department implements a monthly fire facility inspection system:
- Inspection Objects: Factory-wide fire hydrant systems
- Inspection Frequency: Full coverage once per month
- Execution Requirements: Complete all point inspections within the month
- Time Window: Executable at any time during the month
Core Value
- Ensure fire facilities are fully functional
- Meet fire safety regulatory requirements
- Establish preventive maintenance systems
- Reduce fire risk hazards
II. Plan Configuration
1. Create Inspection Plan
Operation Path:
- 【Inspection Management】→【Plan Scheduling】

- Click "New" button
Configuration Parameters: 
| Parameter | Value | Description |
|---|---|---|
| Plan Name | Fire Hydrant Monthly Inspection | Clear identifier |
| Activation Status | Enabled | Auto-generate tasks |
| Inspection Route | Fire Hydrant | Predefined route |
| Start Date | 2025-06-01 | Must be the 1st of the month |
| Cycle Period | 1 month | Monthly cycle |
| Trigger Date | 1 | Generate tasks 1 day in advance |
| Trigger Time | 22:00 | Generate next month's tasks at 22:00 on the last day |
| Overtime Reporting | Yes | Allow cross-month completion |
| Offline Reporting | Yes | Support offline operation |
Key Setting Instructions:
Start date must be set to the 1st of the month, system will use this as baseline for monthly task calculation
III. Task Configuration
1. Single Task Configuration
Operation Steps:
- Locate target plan
- Click "Add Task" icon
Parameter Configuration: 
| Parameter | Value | Description |
|---|---|---|
| Task Name | Comprehensive Fire Hydrant Inspection | Clear task content |
| Executing Personnel | Safety Department | Designated responsible team |
| Nth Day | 1 | First day of month |
| Start Time | 00:00 | Start time at beginning of month |
| Working Duration | 1 month | Full month execution window |
| Execution Frequency | 1 time | Single task per month |
2. Configuration Analysis
- Time Window:
- Task validity: 00:00 on 1st to 24:00 on last day of month
- Flexible execution: Complete within the month
- Execution Requirements:
- Cover all fire hydrant points
- Report abnormalities immediately
- Flexibility Mechanism:
- Support batch execution
- Multi-person collaboration
- Real-time progress tracking
IV. Task Generation and Execution
1. Automatic Generation Mechanism
- Generation Time: 22:00 on last day of month
- Generated Content: Next month's fire hydrant inspection tasks
- Task Characteristics:
- Validity period: Full calendar month
- Reminder settings: Push task reminders at month start
- Progress monitoring: Real-time completion rate display
2. Manual Generation Operation
- Locate target plan
- Click
redo icon in operation column
- Set time range (e.g. 2025-08-01 to 2025-08-31)
- Click "Confirm" to generate immediately
3. Execution Process
- Plan Breakdown:
- Divide inspection routes by area
- Assign responsible persons
- Develop weekly execution plans
- On-site Inspection:
- Check fire hydrant integrity
- Test water pressure and flow
- Record inspection results
- Data Reporting:
- Upload inspection records in real-time
- Photograph evidence for abnormalities
- Generate rectification notices
- Month-end Acceptance:
- System auto-generates monthly reports
- Uncompleted points warned by 25th
- Complete all inspections by 28th
V. Best Practices
1. Execution Strategy
| Time Period | Execution Focus | Target |
|---|---|---|
| Days 1-7 | High-risk areas | 30% completion |
| Days 8-15 | Main production areas | 60% completion |
| Days 16-23 | Auxiliary areas | 90% completion |
| Days 24-31 | Final review | 100% completion |
2. Optimization Suggestions
- Group Execution:
- Divide responsibility areas by factory zone
- Assign area managers
- Parallel execution for efficiency
- Digital Tools:
- Use mobile APP for recording
- Scan QR codes for equipment information
- Auto-generate electronic reports
- Quality Control:
- Randomly check 10% of points
- Monthly supervisor review
- Establish equipment health records
3. Exception Handling
| Exception Type | Solution |
|---|---|
| Equipment failure | Create maintenance work order |
| Untimely completion | Activate emergency plan |
| Data inconsistency | On-site verification |
| New equipment | Manually add tasks |
VI. Precautions
1. Key Configuration Requirements
- Start Date: Must be the 1st of the month
- Route Coverage: Ensure all fire hydrants included
- Permission Settings: Executors need fire equipment operation certification
- Data Backup: Archive inspection records monthly
2. Regulatory Compliance
- Inspection Standards:
- Comply with GB 50016 "Code for Fire Protection Design of Buildings"
- Meet GB 50974 "Technical Code for Fire Water Supply and Hydrant Systems"
- Record Requirements:
- Retain inspection records for at least 3 years
- Use tamper-proof electronic signatures
- Include inspector/reviewer information
3. Safety Requirements
- Ensure two-person inspection teams
- Wear protective gear in high-risk areas
- Equip lighting tools for night inspections
- Immediately activate emergency plans for critical situations