How to Manage Risk Elements
About 540 wordsAbout 2 min
I. Function Introduction
Risk element management is the core standard framework for enterprise risk control, used for:
- Risk Mechanism Analysis: Revealing the causal chain of risk factors → risk events → risk consequences
- Standard Setting: Establishing unified risk assessment and control standards
- Graded Control: Developing targeted measures for different risk levels
- Continuous Improvement: Optimizing the risk management system
Risk Element Composition
| Element | Definition | Function | Example |
|---|---|---|---|
| Risk Factors | Potential triggering conditions | Identifying risk sources | Flammable material storage |
| Risk Events | Direct triggers | Accident mechanism analysis | Leakage/fire |
| Risk Consequences | Final impacts | Loss assessment | Explosion/casualties |
Core Value:
- Unify risk assessment standards
- Standardize control measures
- Support precise grading
- Promote systematic control
Legal Basis:
- 《Basic Norms for Enterprise Safety Production Standardization》(GB/T 33000)
- 《Risk Management Principles and Implementation Guidelines》(GB/T 24353)
Access Entry:
- Administrator logs into management backend
- Navigation menu select: 【Risk Identification】→【Risk Elements】

II. Add Risk Element
Operation Steps:
- Click "New" button on toolbar

Fill in key information:
- Association Settings:
- Risk Object (Pre-created: equipment/area/operation)
- Project (Hazard source/operation step)
- Basic Information:
- Element Code (Unique identifier, e.g. FE-001)
- Element Name (Risk factor + risk event, e.g. "Flammable Liquid Leakage")
- Risk Assessment:
- Evaluation Methods:
- SCL (Safety Checklist): Routine equipment inspection
- JHA (Job Hazard Analysis): Operation activity risk analysis
- LEC (Likelihood Exposure Consequence): Complex environment assessment
- Inherent Risk Level:
- Major Risk (Red)
- High Risk (Orange)
- Medium Risk (Yellow)
- Low Risk (Blue)
- Evaluation Methods:
- Standard Control Measures:
Measure Type Filling Requirements Example Engineering Inherent safety design Explosion-proof electrical/leak alarm Management Process control Work permit/inspection system Training Capability improvement Emergency response training PPE Protective equipment standards Chemical suit/respirator Emergency Response procedures Leak handling plan
- Association Settings:
Click "Save" to complete creation
Precautions:
- Inherent risk level refers to natural risk without control measures
- Control measures must comply with industry mandatory standards
- Evaluation methods must match risk type
III. Modify Risk Element
Operation Steps:
- Locate target risk element
- Click
edit button in operation column
- Modify:
- Evaluation methods (Adjust according to risk characteristics)
- Control measures (Update industry best practices)
- Applicable objects (Expand application scope)
- Click "Save" to submit
IV. Delete Risk Element
Operation Steps:
- Locate target risk element
- Click
delete button in operation column
- Confirm deletion operation
Deletion Restrictions:
- Cannot delete if referenced by risk points
- Cannot delete if assessment records exist
V. Best Practices
1. Element Design Principles
- Comprehensive Coverage: Cover all enterprise risk types
- Scenario Adaptation:
- Equipment risk: Prioritize SCL method
- Operational risk: Use JHA method
- Environmental risk: Apply LEC method
- Dynamic Optimization: Annual review and update
- Level Determination:
- Inherent risk requires expert assessment
- Reference historical accident data
- Consider worst-case scenarios
- Measure Formulation:
- Comply with regulatory mandatory requirements
- Reference industry best practices
- Define clear execution standards
- Graded Control:
- Major risk: Corporate-level control
- High risk: Department-level control
- Medium risk: Team-level control
- Low risk: Position-level control
2. Application Scenarios
| Scenario Type | Risk Element Example | Evaluation Method | Control Focus |
|---|---|---|---|
| Hazardous Chemical Storage | Flammable Liquid Leakage | LEC | Leak-proof design/Emergency shower |
| High-altitude Work | Fall Risk | JHA | Safety harness/Supervision system |
| Electrical Operation | Electric Shock Risk | SCL | Insulation protection/LOTO procedure |
| Confined Space | Oxygen Deficiency | LEC | Gas detection/Rescue plan |